Case Study

Private Residence, Hale, South Manchester

The Project

This project was to provide a contemporary extension on an 18th-century arts and crafts home in the South Hale Conservation Area. It consisted of the demolition of a previous extension, the erection of a new proposal, internal and external redecoration, and landscaping.

45

panes of stained glass were removed, encapsulated within double glazed units and reinstalled into the property.

6

bedrooms, 4 bathrooms, 4 reception rooms and basement with a gym.

Our Goals

Objectives

The project aimed to remove a dated 2000’s extension with a more contemporary but timeless proposal, that would provide the modern spaces required in a home of this scale.

The proposal combined off set flat roofs, and large format glazing to contrast the existing building and allow 180-degree views of the garden. This glazing also opened onto raised herb beds, to allowing their fragrance to full the space and inspire the many meals to be prepared within.

Internal redecoration throughout, repair of external timber detailing and replacement of all timber windows, brought the home as a whole up to the standard of the new addition.

The flow of the proposal was coordinated with the Landscape Architect to allow the garden to become one with the home.

Outcomes

Our client loved the proposal and was even more impressed once completed on site. 

We worked closely with the contractor on site to ensure the final detailing was perfect, and this was evident when finalised.

Use Type

Residential-Led

Location

Hale, South Manchester

Facts

Use Type: Residential

Number of homes: 1

EK services provided

"The project was a huge success. The process was long but necessary to ensure that the client's needs and goals were achieved and that all the required regulations and policies were met."
1 / 6

Our Approach

As with all our design projects, we started with pen and paper. We undertook very early design workshops with the client, overlaying simple plans and sketch concepts, to move through a lot of ideas quickly and remove obvious sticking points before progressing to more detail designs.

We then refined these concepts into more developed designs, and integrated 3D modelling and visualisation to better convey the proposals to the client.

On this project we were undertaking the planning application and spent almost a year in planning, battling to keep the integrity of the design while working with the council and conservation team to meet their aspirations for the project.

A technical design and construction information package was then produced, which was comprehensive due to the number of bespoke elements in the design.

When finally on site we also undertook the role of Contract Administrator, which paired well with our continued design support on site to guarantee the finalise product was delivered as intended.

The Result

The project was a huge success. The process was long but necessary to ensure that the client’s needs and goals were achieved and that all the required regulations and policies were met. 

Our close collaborative working with the contactor, landscape architect, structural engineer, M&E engineer, suppliers and of course the client, meant that no detail when unchecked.

The design principles along with the material choices and construction methods have secured a final product that should stand the test of time.

Contact us

FAQs

The £1.1 million contract covered far more than the new extension alone. It funded the demolition of the existing 2000’s addition, the construction of the contemporary replacement, full internal redecoration, repair of external timber detailing, and replacement of all timber windows. It also accommodated the specialist encapsulation of 45 stained glass panes into double glazed units, and the landscaping works coordinated with the Landscape Architect to tie the garden into the home.

The property is not listed, but it sits within the South Hale Conservation Area and is recognised as an undesignated heritage asset. This status carried real weight on the project. Although it did not bring the statutory constraints of listing, it meant the design had to satisfy the council and conservation team’s aspirations for the area, and protect the character of the 18th-century arts and crafts home at the heart of the site.

It is the reason the proposal was developed with such care. The contemporary extension was deliberately set against the existing building rather than mimicking it, the 45 panes of stained glass were retained and encapsulated within double glazed units rather than replaced, and the original timber windows and external detailing were repaired and restored. Nearly a year was spent in planning, working through the conservation team’s requirements while protecting the integrity of the design.

The result is an addition that respects the heritage of the property without being held back by it.

From contract signing to practical completion, the project ran for 16 months on site. The programme reflected the scope and complexity of the works rather than the extension alone.

Demolition of the existing 2000’s addition came first, followed by groundworks that proved more demanding than anticipated. With the property built on a raised plateau, the mains sewer connection sat nearly 3m below the surface and took three progressively larger excavators and two weeks to expose. Construction of the new extension then ran alongside full internal redecoration, repair of external timber detailing, and replacement of all timber windows across the 18th-century home. The 45 panes of stained glass were carefully removed, encapsulated within double glazed units and reinstalled, and landscaping was coordinated with the Landscape Architect to bring the garden and home together.

We acted as Contract Administrator throughout, working closely with the contractor to ensure every bespoke detail was delivered as designed. Sixteen months on site produced a finish the client was even more impressed with than the proposal that started it.

From our instruction to issue of the final completion certificate, the project ran for 30 months. The programme reflected the depth of work required at every stage, not just on site.

The early phase began with pen and paper. We ran design workshops with the client, overlaying simple plans and sketch concepts to move through ideas quickly and resolve obvious sticking points before progressing. These concepts were refined into more developed designs, with 3D modelling and visualisation brought in to convey the proposals clearly.

Planning took close to a year on its own. As an undesignated heritage asset within the South Hale Conservation Area, the property demanded careful negotiation with the council and conservation team to protect the integrity of the design while meeting their aspirations for the area.

A comprehensive technical design and construction information package followed, made substantial by the number of bespoke elements in the scheme. Sixteen months on site then delivered the demolition, the new extension, full internal redecoration, repair of external timber detailing, replacement of all timber windows, and the encapsulation and reinstallation of 45 stained glass panes. We acted as Contract Administrator throughout, pairing this with continued design support to guarantee the final product matched the intent.

Thirty months from instruction to final completion certificate, delivered as designed.

f we were to design it again, we would push harder to incorporate more green energies into the property. The scheme delivered a contemporary, timeless extension on a home of real heritage value, but the opportunity to embed renewables more fully into the design is one we would now treat as central rather than additional.

A property of this scale, with six bedrooms, four bathrooms, four reception rooms and a basement gym, carries a meaningful energy demand. Ground source heat, solar generation, improved fabric performance and smarter integration with the landscape could all have been explored further. The raised plateau, the extent of the groundworks already required for the sewer connection, and the scale of the landscaping coordination with the Landscape Architect would have lent themselves to a more ambitious approach.

The design holds up. The detailing, the large format glazing, the offset flat roofs and the integration with the garden all delivered exactly as intended. Greater renewable integration is the one area we would revisit, and it is a principle we now carry into every project that follows.

Contact one of our experts today

Questions about a building, project or survey? Get in touch and our team is ready to help with practical straight talking advice

Contact us

What we do

Sectors

About Us

Case Studies

Learn With Us

News & Views

1. London Office

Earl Kendrick
The Building Centre
26 Store Street
London
WC1E 7BT

2. North Office

Earl Kendrick
Parsonage Chambers
3 Parsonage
Manchester
M3 2HW

4. Midlands Office

Earl Kendrick
Edmund House,
12-22 Newhall Street
Birmingham
B3 3AS

4. South Coast Office

Earl Kendrick
Foundry Hove
3 Ellen St
Brighton and Hove
Hove
BN3 3LN

4. West Office Bristol

Earl Kendrick
Bristol Castle Park
All Saints' Street
Bristol
BS1 2LZ

5. West Office Cardiff

Capital Tower
Greyfriars Road
Cardiff
Wales
CF10 3AG

T: 0203 6671510

6. West Office Exeter

Earl Kendrick Associates (West)
The Mount
72 Paris St
Exeter
EX1 2JY

6. West Office Torquay

Earl Kendrick
Suite 41
15 Montpellier Road
Torquay
TQ1 1DL

T: 0203 6671510

Copyright © 2025 Earl Kendrick Limited. All rights reserved. Registered in England & Wales No. 07474203 | VAT Registration No. 108635810Registered Office: 2nd Floor, One Hobbs House, Harrovian Business Village, Bessborough Road, Harrow HA1 3EXHosted and Built by NXRD

Privacy Preference Center