Case Study

Insurance Reinstatement for Fire Damaged Property – Caroline Lodge

The Project

Caroline Lodge, a purpose-built block of flats damaged by a serious air fryer fire, appointed Earl Kendrick to manage insurance remediation, delivering full reinstatement of the affected apartment and coordinating related building repairs to restore safety and appearance to pre-incident standards.

4

Storeys

1

Flat

5

Rooms

Our Goals

Objectives

To deliver full reinstatement of the fire-damaged apartment, repair consequential damage to communal areas and external elements, and manage insurance-funded works efficiently from assessment through to completion.

Outcomes

A comprehensive refurbishment was completed within 16 weeks, including full kitchen renewal, replacement of fixtures and finishes, new boiler installation, and reinstatement of smoke-affected communal areas. The project was delivered on time and within the insurer’s budget, restoring the property safely and to a high standard of finish.

Length of project

10 Weeks

Location

Caroline Lodge, England

Scope

£93,000 – Total value of insurance-funded works
10 weeks – Duration from start to completion
4 storeys – Height of the purpose-built block
1 flat – Fully reinstated following extensive fire damage
12 neighbours – Residents affected by smoke and water ingress
5 rooms – Refurbished and fully redecorated in the damaged apartment

EK services provided

“Complete reinstatement of a fire damaged apartment, including repairs to communal areas and external elements, with efficient management of insurance funded works from assessment to completion.”

Our Approach

Earl Kendrick coordinated the entire reinstatement process, from initial loss assessment to contractor appointment and quality monitoring. The project involved complete strip-out and renewal of the kitchen and internal finishes, installation of a new boiler system, and extensive cleaning of smoke residues. Roof and front elevation repairs were completed concurrently, alongside specialist cleaning to communal areas and lift doors to remove residual contamination.

The Result

The works reinstated the property to full habitability while improving energy efficiency and fire resilience. EK’s clear communication with insurers and residents ensured smooth progress and transparency at every stage. The project demonstrates how professional oversight in insurance remediation can deliver rapid recovery without compromising on safety, specification, or long-term building performance.

Contact us

FAQs

A air fryer fire caused extensive heat and smoke damage throughout a two-bedroom flat, affecting structure, finishes, and mechanical systems. The intensity of the blaze and resulting smoke spread required full internal renewal. Rapid assessment and coordination with the insurer allowed for prompt remediation, limiting disruption to neighbouring residents and preventing further deterioration of affected communal areas.

EK acted as contract administrator and lead consultant, liaising closely with the insurer’s loss adjuster and the appointed contractor. Detailed schedules of works and cost assessments were prepared to ensure fair, transparent reinstatement within policy limits. Regular inspections and progress reports maintained quality and compliance throughout the project, leading to successful completion within the agreed 10-week timeframe.

The project included full renewal of kitchen units and appliances, modernised finishes, and a new high-efficiency boiler. Fire compartmentation and materials were upgraded to current standards, improving the flat’s overall safety and resilience. Communal areas and the building exterior were also refreshed, enhancing both the visual appeal and long-term durability of the block.

Smoke from the incident spread through shared corridors and lift lobbies. EK arranged specialist cleaning to lift doors, walls, and ceilings to eliminate odour and residue, alongside redecoration where necessary. This process restored the environment to a safe and clean condition, ensuring no lingering effects for other residents and maintaining the building’s insurance and fire safety compliance.

Swift response and clear communication between stakeholders are key in insurance remediation. By managing design, cost control, and site supervision under one team, EK ensured efficiency and transparency from the outset. The project highlights the importance of proactive oversight to safeguard reinstatement quality, resident safety, and insurer confidence in both workmanship and outcome.

Contact our Director

Michael BurkinshawDirector

e: michael.burkinshaw@earlkendrick.com

Contact one of our experts today

Questions about a building, project or survey? Get in touch and our team is ready to help with practical straight talking advice

Contact us

What we do

Sectors

About Us

Case Studies

Learn With Us

News & Views

1. London Office

Earl Kendrick
The Building Centre
26 Store Street
London
WC1E 7BT

2. North Office

Earl Kendrick
Parsonage Chambers
3 Parsonage
Manchester
M3 2HW

4. Midlands Office

Earl Kendrick
Edmund House,
12-22 Newhall Street
Birmingham
B3 3AS

4. South Coast Office

Earl Kendrick
Foundry Hove
3 Ellen St
Brighton and Hove
Hove
BN3 3LN

4. West Office Bristol

Earl Kendrick
Bristol Castle Park
All Saints' Street
Bristol
BS1 2LZ

5. West Office Cardiff

Capital Tower
Greyfriars Road
Cardiff
Wales
CF10 3AG

T: 0203 6671510

6. West Office Exeter

Earl Kendrick Associates (West)
The Mount
72 Paris St
Exeter
EX1 2JY

6. West Office Torquay

Earl Kendrick
Suite 41
15 Montpellier Road
Torquay
TQ1 1DL

T: 0203 6671510

Copyright © 2025 Earl Kendrick Limited. All rights reserved. Registered in England & Wales No. 07474203 | VAT Registration No. 108635810Registered Office: 2nd Floor, One Hobbs House, Harrovian Business Village, Bessborough Road, Harrow HA1 3EXHosted and Built by NXRD

Privacy Preference Center